Task allocation for the following two weeks:
1 | Cooling system components assemble | JD,YW |
2 | Control system components assemble | JS |
3 | Power system components assemble | CB |
4 | Umbrella structure assemble | CA, YC |
Task allocation for the following two weeks:
1 | Cooling system components assemble | JD,YW |
2 | Control system components assemble | JS |
3 | Power system components assemble | CB |
4 | Umbrella structure assemble | CA, YC |
Task allocation for the following two weeks:
1 | Components testing (cooling system) | JD,YW |
2 | Components testing (control system) | JS |
3 | Components testing (power system) | CB |
4 | Components testing (umbrella structure) | CA, YC |
Task allocation for this week:
1 | Draft components testing plan (cooling system) | JD,YW |
2 | Draft components testing plan (control system) | JS |
3 | Draft components testing plan (power system) | CB |
4 | Draft components testing plan (umbrella structure) | CA, YC |
Task allocation for this week:
1 | Materials prepare and purchase | ALL |
2 | Update availability | ALL |
3 | Update price list | ALL |
Task allocation for these weeks:
1 | Components testing (cooling system) | JD,YW |
2 | Components testing (control system) | JS |
3 | Components testing (power system) | CB |
4 | Components testing (umbrella structure) | CA, YC |
Task allocation for this week:
Line# | Task description | Team member
assigned |
1 | Drafting Design Document: Power system |
CB |
2 | Drafting Design Document: Control System | JS |
3 | Drafting Design Document: Cooling System | JD, YW |
4 | Drafting Design Document:3D print sketch/ Umbrella | YC, CA
|
Task allocation for this week:
Line# | Task description | Team member
assigned |
1 | presentation preparation : patent/ power system | CB |
2 | presentation preparation: Control System | JS |
3 | presentation preparation: Cooling System | JD, YW |
4 | presentation preparation: 3D print sketch/ Umbrella | YC, CA
|
Task allocation for this week:
Line# | Task description | Team member
assigned |
1 | slide drafting: patent/ power system | CB |
2 | slide drafting: Control System | JS |
3 | slide drafting: Cooling System | JD, YW |
4 | slide drafting: 3D print sketch/ Umbrella | YC, CA
|
Task allocation for this week:
Line# | Task description | Team member assigned |
1 | Double-check requirement with user | JS |
2 | Proposal refining: Patents add-on | CB |
3 | Proposal refining: grammar check | CA |
4 | Cooling system(both): flow charts, schematics, and relative research | JD, YW |
5 | Control system: flow charts, schematics, and current flow and voltage | JS |
6 | Power system: flow charts, transmission rate, list of input and output | CB |
7 | 3D print modeling and material selecting | CA, YC |
8 | Schedule the presentation | YC |
9 | Multiple Sclerosis Background research | ALL |
Task allocation for this week:
Line# | Task description | Team member assigned |
1 | Schedule proposal presentation | YC |
2 | Followed-up presentation preparing: | ALL |
3 | Presentation preparing (Patents research): | CB |
4 | Presentation preparing (Final design sketch 1): | JS |
5 | Presentation preparing (Final design sketch 2): | YW |
6 | Presentation preparing (Circuits set up): | CB & JS |